Three years behind an expired permit.
The sidewalk on the 4600 block of Wisconsin Avenue NW has been fenced off for a construction site that has shown no activity in years. The only way past is a sheet of plywood in the roadway -- warped, splintered, and broken through at the curb. It is impassable in a wheelchair. The permit authorizing all of it expired on July 16, 2023.
- Location
- 4620 Wisconsin Avenue NW, Tenleytown, Washington, DC 20016
- Ward
- 3 // ANC 3E
- Documented
- August 14, 2026
- Category
- sidewalk_ada -- accessibility failure at a construction closure
- Public space permit
- P.10945986-R1 // WISCONSIN OWNER LLC // restricted dates 01/18/23 to 07/16/23 -- EXPIRED
- 311 tickets
- 26-00278799 (closed as complete, falsely) // 26-00485677 (inspected, unresolved)
01What is on the ground
02What happened when it was reported
- May 8, 2026311 service request 26-00278799 filed on the closed sidewalk and the condition of the temporary ramp.
- July 30, 2026DC closes 26-00278799 with a note stating that the work was completed. No work had been done. Nothing at the site had been touched.
- August 14, 2026The site is revisited and photographed. The photographs on this page are from that visit. Service request 26-00485677 is filed, asking both for a repair and for an explanation of the false closure.
- August 18, 2026DDOT acknowledges the report and says it will look.
- August 24, 2026DDOT posts an inspection comment to the ticket and closes it. The comment is reproduced below.
DDOT has completed the inspection. There is a financial bond in place to restore the sidewalk and remove all barriers. This is a process that is ongoing. The previous owners of the building have filed bankruptcy. The property is in litigation and the building currently has no owner. The district department of transportation is working to return the sidewalk to the citizens. In its current state, the sidewalk is not safe to open. Your patience is greatly appreciated.
DDOT comment on service request 26-00485677 // August 24, 2026
03Why that answer does not close the case
Take the response at face value. A bond is posted, the previous owners are in bankruptcy, the property is in litigation, and no one currently owns the building. All of that is a real and sufficient explanation for why the permanent sidewalk has not been rebuilt. None of it is an explanation for the plywood.
The temporary pedestrian route is not waiting on a bankruptcy court. It is a maintained condition in public space, under the District's control today, and it can be rebuilt to a passable standard in an afternoon for the cost of materials. A closure that will last years is exactly the case where the temporary route matters most, not least.
Three questions remain unanswered:
- When does the temporary ramp get fixed? Not the permanent sidewalk -- the plywood, now.
- Why was the first ticket closed as completed? A closure note asserting that work was done, when no work was done, is not a clerical slip. It ends the complaint, resets the clock, and forces the resident to start over. The person who reported this says it has happened to them repeatedly.
- What is the timeline, and why is it not posted? Neighbours are asking about this block in public forums. A sign at each end stating what is happening and when the sidewalk returns costs almost nothing and answers the question for everyone who walks up to it.
04The standard that applies
A sidewalk closure does not suspend the right to walk down the street. Under the ADA and its implementing guidance, when a pedestrian route is closed for construction, an alternate accessible route must be maintained for the duration of the closure -- firm, stable, slip-resistant, of adequate width, and free of abrupt level changes. Warped plywood with a broken edge and peeling tape does not meet that standard for a wheelchair user, a walker user, a stroller, or anyone with low vision.
Occupancy of public space for construction staging is separately licensed under 18 DCMR 2405 and DDOT's public space permitting. That license is what expired on July 16, 2023. The barriers, the fence, and the closure have continued without it.